Submit Your Stair/Rail Photos For Your Free Estimate. Send to 45stairman@gmail.com

Name

Email *

Message *

Thursday, January 21, 2016

Oak Stair And Rail Remodel With Iron Balusters Egg Harbor Twp NJ






Over the post rail on raised panel newel

Raised panel post and twisted iron baluster with double basket

Oak Stair And Rail Remodel With Iron Balusters Egg Harbor Twp NJ  We removed all the old posts, rail and balusters.  The floor guy came in and sanded and stained the whole first floor and staircase and installed new flooring in upstairs hallway, this took him about a week. We came back and installed posts and rail in one day.  This customer loved the look of an over the post style rail, but also wanted the boxed newel posts with raised panels.  We were able to do both for the customer and he was beyond thrilled when I told him we could do both.   This is a great custom look that you don't see that often but it looks fantastic.  After the install of rail and post, he had posts and rail stained to match the new floors.  We came back to complete the project by installing the iron balusters.  It was great to do this job with over the post rail and the customer loved the outcome.  If your stairs need remodeled and you are looking for a custom look give Ron a call at 215-694-5046 or email at 45stairman@gmail.com for your FREE consultation and you can get your very own Oak Stair And Rail Remodel With Iron Balusters, whether you live in Egg Harbor Twp NJ , Ocean City, Margate, Ventnor or Long Port and surrounding towns.

Sunday, January 17, 2016

Hardwood Stair Replacement With Box Newels And Iron Balusters Medford NJ


Hardwood Stair Replacement With Box Newels And Iron Balusters Medford NJ. This was for a fellow contractor homeowner who remodeled his whole house and only needed to complete the foyer. I must say he did a great job with the rest of the house. (Not all homeowner remodels look this nice) He said the one project he wouldn't touch was the stairs and rails. So, he found my blog and loved what he saw and decided to give me a call. We scheduled the project to start a few weeks from then, because he being a contractor, he was going to remove the existing stair himself.  On day one we were able to show up with new stair and start immediately by getting the stair set in place. The new stairs were installed and secured before noon, and we started the rail install.  It took @ 2-3 days for newel posts and rail to be installed. He had the painter come in and stain everything to match the floors that were going in the foyer. We then came back and installed the iron balusters to complete the job.  If you'd like to update your house and bring it into this century, and you live in Medford, Southampton, Voorhees, Marlton, Mt Laurel, Cherry Hill, Moorestown, or surrounding area, give Ron a call at 215-694-5046, or email him at 45stairman@gmail.com and schedule your FREE consultation for your very own Hardwood Stair Replacement With Box Newels And Iron Balusters Medford NJ.